Detailed Maintenance Routine
When doing the yearly maintenance on the Oxipack SLT, always follow this maintenance routine and report the results in the format you can download with the button below. On your left you can see the steps in action and if you scroll down, the steps are written out and made into an interactive checklist you can download.
Maintenance routine steps
Important: ‘When working in the machine, power and air supply must be disconnected’
Step 1
Inform on site how the machine works
Step 2
Take pictures of the conditions of the machine, make specific pictures of any defect, note down the result
Step 3
Perform multiple tests and note down the result
- Test 1: Empty test
- Test 2: Test with a package
- Test 3: Test with a dummy
Step 4
Unscrew the gas spring bolts
- Remove the pins from the hinges
- Check all bolts with if they are set at 4Nm
- Check all bolts at the top
Step 5
Check the seal
- Clean the seal
- Note down the results in the report
Step 6
unscrew all the bolts
- Unassemble the machine
- Check inside
Step 7
Unscrew the sensor connector
- Connect the test sensor
- Disconnect the valves and replace with new valves
- Connect the new valves to the new sensor
- Press red button to clear error
- Press the green button to start the system check
Step 8
Make sure the pressure sensor is clean
- By tapping it gently
Step 9
Assemble the machine
- Put the inside in the outside
- Put the lid back in place
- Put the pins in the hinges
Step 10
Replace the insert
Step 11
Perform final tests
- 3 Empty tests
- 3 tests with a package
- 3 tests with a dummy
Step 12
Note down the results
- The results are stored in the logfile (see separate instruction extract logfile)
- Note down the results
Important: mail the filled in report to support@Oxipack.com